That's what GBI's SMP group delivers — structural, mechanical, and piping work coordinated under one project team, sequenced correctly, executed by crews who understand how the pieces connect.
GBI's team provides critical lift plans, crane location and radius studies, erection sequence drawings, and connection design. This keeps the field ahead of problems, not behind them.
Much of the most critical work in pulp, paper, and forest industries happens during planned shutdowns. Compressed windows. Facility offline. Every day of delay costs real money, and the pressure to cut corners is highest.
The OGE Energy coal conveyor replacement, 2,100 linear feet, 90-day outage, 24/7 operations, approximately 50,000 manhours, zero recordable incidents — that is the standard GBI brings to every shutdown, in every industry.